Stay Connected
Sign up to receive updates on local watershed projects, volunteer opportunities, and how you can help protect streams and ecosystems across the Fraser Valley.
Most years, the Fraser River freshet floods the Tom Berry gravel pit in Hope, BC, attracting juvenile salmon looking for calm water. When the river recedes, salmonids stranded there suffer high mortality due to high water temperatures, low dissolved oxygen, and predation by invasive species. Heavy gravel mining, last done for the construction of the Coquihalla Highway in the 1980s, left the pit and surrounding areas rocky, dry, and lacking soil or vegetation. The gravel pit is owned by the Ministry of Transportation and Infrastructure Finance Authority (BCTFA).
Building a year-round connection between the gravel pit and the Fraser River, while restoring, enhancing, and protecting habitat in and around the gravel pit, for native fish and wildlife. That includes connecting the gravel pit to nearby Silverhope Creek to ensure a steady flow of cool, clean, oxygenated water. Invasive plants would be removed and areas replanted with native trees and shrubs. The work would be part of a broader regional plan to reconnect salmon habitat in freshwater floodplains along the river.
Today, Tom Berry is transforming an abandoned gravel pit into a thriving wetland, a living example of what collaboration and care for our watersheds can achieve.
Tom Berry gravel pit circa 1976. Note the dry, rocky, unvegetated landscape
Think of the Tom Berry gravel pit as a bathtub. The tap is created by digging a spawning channel between the pit and Silverhope Creek. To drain the tub, a main channel connects the gravel pit to Bristol Slough, where salmon can reach the Fraser River and on to the Pacific Ocean. The second drain is an overflow channel connecting the pit directly to the Fraser River, relieving pressure during high water. These channels will be planted with native trees and shrubs, including willow, red-osier dogwood, and hardhack. The tub itself is an open wetland edged with native plants and shrubs that shade the water, provide a ‘rain’ of insects for salmonids, and create habitat for other fish and wildlife.
The spawning channel is constructed, connecting Silverhope Creek to the gravel pit. An intake valve is installed so water levels in the channel can be controlled. A first drain is built, connecting the gravel pit to the Fraser River, to act as a spillway during high water flows. A second drain connects the gravel pit to Bristol Slough, for salmon to reach the Fraser. Then the tub is contoured to include scalloped edges, varied bank slopes, and aquatic benches (raised, flat areas for vegetation to grow). This increases complexity and creates more habitat types for plants and animals.
As part of the project, the FVWC and DFO worked with community partners to build two bridges crossing the spawning channel, connecting with a local trail network.
The FVWC field crew removes invasive species, plants riparian areas, and uses bioengineering to stabilize soils.

Heart of the Fraser